Notice of Right of Way Clearing

Barron Electric Cooperative will be performing right of way (ROW) maintenance in the Sumner Township sometime during 2019. This may include mechanical chopping, hand cutting or side trimming. No chemicals will be used. A minimum of 15’ of clearance is required around the top wire and 20’ at the ground line on each side of the pole. The removal of danger & leaning trees will also be considered. This clearing will be done on primary overhead lines up to the transformer only.

If you have questions or concerns, please contact BEC’s Operations Dept at 800-322-1008 or email us at [email protected]